Hacker Newsnew | past | comments | ask | show | jobs | submitlogin

I’d like to take a moment to praise the writing here. Rigorous, dense, and well-organized; communicative rather than coughing up tables of raw figures in prose form.

I’d refer to the source studies, but at $9,990 per region… Ms Pickerel’s overview seems plenty informative for me.

Regarding EMEA:

> Grid-scale battery storage costs are now decisively cheaper than gas peaking across the region. [and price will fall another 33% in the decade ahead]. This shift means storage is displacing open-cycle gas turbines on cost in every gas market across the region, marking a significant structural turning point for power system planning across both the Gulf and Africa.

The analyst’s bottom line:

> From Latin America to Asia Pacific, the combination of falling storage costs and world-class renewable resources is closing off the economic case for new gas peaking capacity, while long-term contracted renewables increasingly set the ceiling rather than the floor on power costs.”

Heady times! For all the gnashing of teeth about regulating our way out of combustion-based production—it’s ultimately superior technology that’s ripened to displace gas peaker plants, no arm-twisting required. “Not with a bang, but a whimper”…



> In the Middle East and Africa, where utility-scale solar already leads at $37/MWh, four-hour storage is forecast to fall a further 33% to $80/MWh by 2035

I'm struggling to understand the numbers here. How does a fall of 33% on $37 make it $80?


I think the $37 might be the cost of producing the energy via solar, and it’s the grid-scale batteries that are expected to get cheaper:

> Four-hour storage reaches $120/MWh in 2026 and is forecast to fall 33% to $80/MWh by 2035, cementing its role as the enabling technology for solar and wind integration.

Cheap or not, solar isn’t dispatchable on demand, so in and of itself it doesn’t replace the role of a peaker plant. But now that the big batteries are a viable thing, solar-plus-battery is feasible to handle the parts of the demand curve that required open-cycle gas plants before.


will need a bit more than four hours of storage though


Horses for courses, right? They build these entire peaker power plants to sit idle most of the time, just to handle the couple dozen or hundred hours of maximum load in the year.

4 hours at a time hopefully buys you your way through such a peak, even if it doesn’t get you through weeks at a time… and presumably you can top it up from base load after demand peaks for the day, right?

In the equatorial and desert regions they’re talking about, I think both seasonal supply changes and demand profile might be more consistent than, say, dreary cold parts of Europe..


That's a big part of what drives me crazy about the papers I've seen on this work. People like to quote some levelized price of energy and say "this costs less than an AP1000" and you never see modeling of "here's the price in California, here's the price in New York"


I would check out these recent articles. They’ve taken the step to model the entire grid hour by hour.

This is of course not how reality will play out, since the grid is market driven, but it’s quite interesting to see the results.

Denmark 2026:

https://www.sciencedirect.com/science/article/pii/S036054422...

Finland 2025:

https://www.sciencedirect.com/science/article/pii/S036054422...

Australia 2025–26:

https://www.csiro.au/en/research/technology-space/energy/Ele...


Sure.

But no one is claiming that there will only be 4h-storage


I don't see a lot of realistic talk about what the actual storage requirements are. You have to be concerned about:

(1) ordinary diurnal variation (overnight, lets say 12 hours)

(2) extremely unfavorable weather (see https://en.wikipedia.org/wiki/Dunkelflaute)

(3) annual variation (you might get 3x the sunlight in summer than winter? do you build 180 days of storage or do you overbuild solar systems 3x and get Casey Handmer to dream up something useful to do with that excess energy that doesn't have a stupendous capital cost?)

The "have a natural gas backup plan" is worse than people think for a lot of reasons, in terms of the laws of political science and economics you're going to find that that tail winds up wagging the dog, the whole market will get designed around the needs of those turbine owners, it's going to cost the same if they are running turbines for 5 minutes a year or 20 days a year, and ultimately you're never going to get rid of it. If you really plan to run the system 5 minutes a year what are the odds it will really work when you need it? You have to not just support the turbines you hardly ever use, pipelines you hardly ever use, drilling and storage operations for gas, etc.


Yeah I think it really only works well in the central latitudes. The American South, the tropics and equatorial regions, Southern Europe, etc. that get a lot of high-angle sunlight year-round.

Otherwise you need to deal with long distance power transmission across many political jurisdictions, or local generation for night or other low-solar times. To my mind, nuclear base load with solar and batteries used for things like charging cars or demand-shifting probably makes more sense. It's really a shame that we mostly withdrew from building nuclear plants for the past three or four decades; instead we have reached the point where we have to re-learn how or recreate the tooling needed to build them and they are still too damn expensive.


nuclear base load makes sense from a pure grid engineering PoV, which i think is why it appeals to so many HN folk. Sadly, it makes no sense economically anymore, so it will probably never be built at scale.


They quit building coal burning power plants in the US at the same time and for the same reason they quit building nukes…. The cost of the steam turbine and heat exchanges. I mean, the steam generators for a PWR are bigger than the reactor vessel, it is just insane to use hot water at high pressure to boil water at low pressure.

If nuclear is ever going to be competitive it is going to have to be some kind of reactor that runs at higher temperatures with a gas turbine power set. Could be a fast breeder or HTGR or molten salt but not water cooled. Anyway it is not a bird in the hand.


Never said we should not have been developing the technology. But even with the old PWR designs you're not pumping carbon into the atmosphere, which is the main point.


I mean yes but also there’s a lot more engineering and materials in a NPP beyond the heat exchanger part that makes it so expensive.


Ultimately though about 50% of the cost of a PWR is in the heat handling (heat exchangers and steam turbine) and the building costs to accommodate those systems. If the nuclear part was free they'd still struggle to compete -- the BWRX300 seems to get a lot of cost reduction by eliminating the pumps and heat exchangers and stuff and going to steel-concrete sandwich construction but to do better than that you have to really do something about that steam turbine.

For that matter, it's shocking how small the actual core is for FBRs. The capital cost of FBRs was long projected to be higher because traditionally you had to add a third cooling loop and some other systems but it is projected an sCO2 system today could be cheaper overall.


TIL, thanks! I didn’t realize the “routine” heat exchanger part was such a high % of cost.


It's a lot of metal! Also the first PWRs had a lot of problems with corrosion causing steam generators to fail and these had to be replaced early. Small improvements in design and better chemistry control solved this.

People are highly aware that we haven't fixed the problems construction new nuclear power plants, they are less aware that we've gotten much better at operating them on all the metrics from uptime to occupational radiation exposure.


yeah i have no objection to them apart from cost, and time to first watt.


What political/economical problem? This has already been solved in most regulated markets. Capacity payments are already being made on many grids. Companies are already literally being paid for "doing nothing", being paid for being available for an unusual situation.

Renewables & batteries have high upfront costs but really low operating costs, so that's what you want supplying 90-98% of your power if your goal is lowest cost. (see Ember Energy reports). NatGas has low capital costs but relatively high operating costs, so yes, sitting idle and running a few days a year really is optimal.


Great comments throughout as usual. I’ll add that for the last few percent of generation that might need firm on demand combustion, gas turbines can be fed methanol, ammonia, or hydrogen, all generated from excess low carbon energy. I’d like to think that geothermal will be able to fill this gap, but only time will tell.


How about overbuild and interconnect? You don't have to overbuild for your personal worst case if you can buy power from somebody else if it comes to it.


Bucky Fuller imagined we might build a superconducting power grid that connects the whole world, but... power lines are expensive too and are politically tough because you have to cross so many boundaries that involve so many stakeholders. Realistically moving energy in space as well as time is part of the solution if not the whole solution.

My crazy idea is that you could put some energy producing or consuming facilities (hydrogen factory!) on floating platforms that can move where energy is available.


Sorry for the tangent but as a German I found it interesting (and somehow amusing) to learn that "Dunkelflaute" is an English "Lehnwort" (I couldn't find a proper English translation for that, either).


“loan-word”?


> (3) annual variation (you might get 3x the sunlight in summer than winter? do you build 180 days of storage or do you overbuild solar systems 3x and get Casey Handmer to dream up something useful to do with that excess energy that doesn't have a stupendous capital cost?)

what about the variation regarding winds?


> you might get 3x the sunlight in summer than winter

In the darker parts of Europe, at least, this is broadly balanced out by an increase in wind. But there are dark and still days every year.

I don't know how much storage is needed, but it's a hell of a lot more than four hours.


My understanding is that the first number is the "cost per MWh generated by a PV plant", the second one is the "cost per MWh accumulated and then released by a 4-hour grid-scale battery plant"


$37 = utility-scale solar, now

$80 = 4h-storage in 2035, forecast


I don’t like the writing at all. The writing conflates what’s current versus what’s forecast without sufficient differentiation.


> it’s ultimately superior technology that’s ripened to displace gas peaker plants

What's the ecological impact of constructing all these batteries?


The same as the ecological impact of constructing gas tanks and pipelines. Only using electricity from batteries doesn't have ecological harms, whereas burning gas does.


Gas tanks are made from steel, which last time I looked was a lot cleaner to refine than lithium, and with a lot less energy input.


How so? Both require mining, separating metal from ore and so on. Steelmaking is done in blast furnaces that burn coal. Lithium can be refined by evaporating brine in large open ponds under sunlight.

Let's see some actual numbers.


Here are the relevant numbers:

- Worldwide Li-ion battery production per year: 35GWh

- Worldwide grid capacity: 5000GWs

- Lifetime of a specific cell in a grid scale battery: 20-30 years

- Current known reserves of Lithium worldwide at current usage rates: 80 years

So even if we magically mined all known Li reserves this year, it still would only be about 14% of the grid for 1 hour or about 9 minutes total for the entire grid. You don't actually need to backup the entire grid (only about 20-30% of it), but you need to do it for at least 4 hours. Basically, it isn't even close even if we only used Lithium for this use. You can get more with Na-ion, but if you think NPPs are dangerous (they aren't)...let's just say nobody would ever insure a grid scale Na-ion battery. Just one leak and it goes up with 1000s of tonnes of TNT of explosive force.


Your entire post is fiction. And not the good kind.

> Worldwide Li-ion battery production per year: 35GWh

This source: https://www.iea.org/data-and-statistics/charts/lithium-ion-b... tells me China alone manufactured 1200 GWh in 2022. You're at least an order of magnitude off.

> let's just say nobody would ever insure a grid scale Na-ion battery

Well they did.

https://energiesmedia.com/3-1-mwh-grid-battery-energized/

https://www.energy-storage.news/peak-energy-launches-first-g...


Please re-check your numbers, since they’re all wrong.

For example, the world deployed 1600 GWh batteries in 2025.


Na-ion batteries are very safe?


Substantially smaller than building and running gas peaker plants


So you'd be happy with a lithium refinery at the end of your street?


Good thing lithium is transportable, eh?


Ah, I see, you don't mind the planet being destroyed as long as it's not in *your* back yard?


Batteries are 90-95% recyclable.

Gas is 0% recyclable.


That's nice that they're recyclable.

What's the runoff from the chemical processing to make the batteries like?

Or does it not matter if you poison great swathes of China?


> great swathes of China?

What's the total acreage of lithium extraction ponds in China today?

As distinct, of course, from the artificial lake of sludge known as the Weikuang Dam, four square miles in size, holding rare earth processing sludge waste in Baotou (Inner Mongolia) which is not from lithium processing.

What percentage of China's land area do these tailing ponds amount to, is "great swathes" really a fair estimate?

Do you think that acreage will drop with the current rise in Direct Lithium Extraction (DLE: new technique that skips traditional evaporation ponds, using filters or membranes to pull lithium directly from brine. It's faster, uses less water, and works in areas with lower brine lithium concentrations.) ?

What's your worksheet on waste from fossil fuels V waste from battery production looking like, is it online for others to look at ?


You think the Oil and Gas industry is cleaner?

Recylable is important because it means we don't have to mine as much.


Oh good lord -- cite something real, or stop fear-mongering.


This is what happens when you feed the sea lion.




Guidelines | FAQ | Lists | API | Security | Legal | Apply to YC | Contact

Search: