Nope. The long term plan is for the 1st stage to return under its own power to the original launch site.
https://www.youtube.com/watch?v=kJrFwxE3lzI
They claim that a big part of reducing costs is eliminating recovery operations that made the nominally "reusable" solid-rocket boosters on the shuttle so uneconomical.
Nope. The long term plan is for the 1st stage to return under its own power to the original launch site.
https://www.youtube.com/watch?v=kJrFwxE3lzI
They claim that a big part of reducing costs is eliminating recovery operations that made the nominally "reusable" solid-rocket boosters on the shuttle so uneconomical.