Weird. Unless launch costs come down massively, your power/energy savings get eaten up by cost to launch. Then of course there's maintenance, then latency. Anyway.
Which will be out of date before the thing launches. The previous generation of NVIDIA chips took 140KW per rack to power, and then you have 140KW of heat that you have to extract.
The current generation of NVIDIA hardware is 600KW per rack, with 600KW of heat that has to be extracted. That’s why liquid cooling is the only option available for them.
NVIDIA has already hinted that the next generation of hardware will be over one megawatt per rack.
I'm not sure why you think it will be out of date when it launches.
Cooling really isn't a problem. There are plenty of smart satellite people who've gone through the numbers and verified it will work.
The biggest issue is you can't hope to compete with either latency or bandwidth of ground-based data links. The second biggest issue is you can't replace failed hardware, and you have rely on other units in the network to take up the slack.
At some point the satellite runs out of station-keeping fuel and has to be de-orbited, but I don't know if that's a concern or not. Presumably after five or so years it's reaching the end of its useful life anyway, and would be getting unplugged on the ground, too.
Launch costs are coming down because of Starship, that’s the entire point of the program. The company is going to be launching a starship either way, from their perspective the marginal cost for these data centers is just the cost of the satellite. There’s a good episode of the sharp tech podcast explaining this from the accounting perspective: