There was a post some months back called "Lines of Code Got a Better Publicist" or something along those lines. This is just more of that. I am not impressed by 30 thousand "changes" per day in the slightest without significant added context. When I logged in and prompted Claude today, do I feel like I got +600,000 change value from when I logged in a month ago?
This might be one of those things were everyone on the team takes a 30 minute lunch instead of 60 and just nobody clocks out to get the 1 hour extra over time.. And everyone just kinda ";) ;) ;) Working from our desk while eating lunch ;) ;) ;)"
Absolutely, at this rate most software would be complete in a few hours. I may lack imagination but wtf are you changing? Endlessly refactoring? That’s spinning your wheels renamed as productivity.
lol right? So youre telling me they shipping 150,000 features this week? Or, maybe, they whack-a-moled 149,995 perf or bug regressions and shipping 5 new things. :shrug:
It’s only about 10 per engineer. I’m not at Anthropic and before 2026 I was regularly hitting 1400 commits / year on my GitHub. If agents made me 2x faster (they have, review is still slow; I currently have 40 PRs open) that’d be the same rate.
Right, but why do things this fast to begin with, especially for a product that's already publicly available?
I don't want to use a product that shifts under me as I use it several times a day. I want a product that actually moves slowly and works very reliably.
As an end user: why would I care about how many hundreds of releases a month are being pushed if maybe 1% of them have features I care about?