Given the incredibly hostile regulatory environment they've faced in Texas trying to operate their own private launch site, I think there are very clear benefits in using an established public facility that isn't under threat by constant attempts (often in outright bad faith) to curtail its activity or even get it shut down. It's not a question of money or capability.
But you know it ISN'T private, because every rocket ever designed will end up in public space, either literally in outer space, or dropping parts in the ocean, or a tiny tiny tiny tiny chance of exploding somewhere less convenient.
This idea that you can just make your own little closed off launch pad and therefore ignore society is stupid.
Some of the more onerous pushback comes from people who have been ignored before and turned out to be right. For example, when Dupont and friends first started producing PFAS, someone out there was crying foul about "hey maybe we shouldn't just dump this everywhere", and they were ignored, it was dumped everywhere, and now we get to deal with the consequences because nobody listened to those people.
This has happened hundreds of times, including serious things like lead paint and leaded gasoline, which we KNEW caused direct and measurable harm to people, and yet was completely ignored. A portion of the public has obviously lost ALL trust for the private sector claiming any sort of "this couldn't possibly cause problems" and are willing and able to take action.
If you are a "big" enough entity, there is no such thing as "private". Anything you do, affects a lot of people, and you should be treated that way.
> there aren’t many technical issues to pouring concrete in a good lat-lon
Other than when a powerful and explosion-prone rocket destroyed its launchpad, hurling chunks of steel-reinforced concrete thousands of feet. But it's almost 18 months since that happened.
That incident probably underscores the parent poster's point quite effectively.
That launch was on 20th April 2023, and the next prototype test launch was only 212 days later on 18th November 2023, although I think the pad redesign/rebuild/repair work was complete by the end of July 2023.
So only 3-4 months to redesign/rebuild/repair the pad (although it's probably reasonable to assume some design work had already occurred).
At the end of the day it wasn't a major problem. SpaceX tried something new, it didn't work out, so they had to fix it. Nobody was hurt. Property damage was minimal. The repair didn't take very long. All in all a good example of learning from your mistakes without spending too much time or money overthinking it.
In civil engineering terms, if falling apart with debris thrown thousands of feet doesn't count as a "technical issue" what does?
I'm no rocketry expert, but I'm old enough to remember the Space Shuttle Columbia disaster; I'm pretty sure if you've got falling chunks of steel-reinforced concrete hitting your space vehicle during launch, that's an issue.
The launch pad didn't explode, the rocket on the launch pad exploded. A fully fueled falcon 9 has about as much energy as a small nuclear bomb, it's not a technical issue if your structure is unable to survive that at point blank range.
Oh, definitely, of course it wasn't a good or desirable outcome.
But it was also a prototype being deliberately tested to destruction, so the context as compared to Columbia was quite different. (And it wasn't just the rocket itself that was a prototype, the pad and tower were at least a little as well).
And this has always been SpaceX's approach, rapidly iterating their design by building, testing, destroying, rinse/repeat - so it sometimes feels a little difficult to compare to a more NASA-style design process where a (usually) small number of items are produced with a significantly lower tolerance for failure.
(Edit: And how much better is it to learn these design lessons before the cargo is more fragile/delicate/squishy?)
That building a rocket launch pad is in fact more difficult than pouring a slab for a garage, and there some nontrivial technical issues involved.
Having chunks of the launchpad go flying isn't just an inconvenience - flying debris during launch can damage critical rocket systems, as the Space Shuttle Columbia disaster demonstrated.
and they figured out how to prevent this happening by the next launch just a few months later. So it turned out to be fairly trivial after all. SpaceX is able to iterate in months what it takes Nasa and its contractors years to do.
Soon to change with Starship launching from Boca Chica. And planned to be able to launch from essentially anywhere, eventually (in Musk Time so give it a decade).
I have seen no plans for a 4th launch/catch tower.. has he even hinted at more sites? Or are you referring to the historical BFR design when musk planned on landing them on the ground like falcon?
The government took all the good land for this in the 60s. So the government mostly just has the land in the right places, that's a really important part. Building most of the ground infrastructure, is still custom to every rocket company.