> Yamanaka, an expert on nuclear power engineering, also urged the operator to get to the bottom of a breakdown of electric transformers installed at its Nos. 1 and 2 reactors that has partially prevented the Shika plant from receiving power supplied from outside.
Looks like, 12+ years after Fukushima, that lesson wasn't enough.
Looks like, 12+ years after Fukushima, that lesson wasn't enough.