More like 50%.
Shipping software has a lot of non-coding stuff.
We are in the last [coding] lap of a project that has been ongoing for two years.
I think we probably still have at least another eight to ten months of stuff ahead of us before we ship.
More like 50%.
Shipping software has a lot of non-coding stuff.
We are in the last [coding] lap of a project that has been ongoing for two years.
I think we probably still have at least another eight to ten months of stuff ahead of us before we ship.