> And pretty much all nuclear projects are finished behind schedule and wayyy above budget.

All projects do, including wind and solar.

--- start quote ---

Ernst & Young (EY) has found that an average power and utility megaproject is delivered 35% over budget and two years behind schedule

Of the megaprojects surveyed, 64% were delayed and 57% were over budge. Almost three-quarters of hydropower, water, coal and nuclear infrastructure projects were over budget by 49% on average,

--- end quote ---

https://www.offshorewind.biz/2016/12/02/offshore-wind-projec...

> And realizing ten times the current building capacity for nuclear plants

How much do we need to overbuild wind and solar?




Nuclear power projects are not just over-budget, they start off with a budget of a couple of billions, whereas individual solar or wind power projects are way smaller and therefor carry less of a risk. Nuclear power requires a huge financial backing from a single entity (even it is "fed" by multiple sources). Almost always, the risk is carried by society, the profit, if any is gobbled up by some corporation.

There is no need to "overbuild" wind or solar. There has never been any illusion those sources will produce at 100% capacity all the time. There will eventually be energy storage to level out the peaks, but most countries still have years to build up to the point where this is necessary.