Thanks, good catch - it is indeed the number of cycles. I had reorganized that sentence planning to move the number of cycles and instead it just got dropped.
Fixed and credited. Now it says:
> Let's say the load takes 300 cycles to finish, which is a typical latency. Then, on an Haswell machine with a ROB size of 192...
Fixed and credited. Now it says:
> Let's say the load takes 300 cycles to finish, which is a typical latency. Then, on an Haswell machine with a ROB size of 192...
https://github.com/travisdowns/travisdowns.github.io/commit/...