I hear ya. Once the spec is finalized for the year I produce a change log. I have done so in between versions before but things tend to be menial and/or change a lot and it was a lot of work for not too much gain. Willing to go back on this. You can always watch the commits go in here though: https://github.com/tc39/ecma262/commits/master.