> GSLV-Mk III-D1 is the first developmental orbital launch of the Geosynchronous Satellite Launch Vehicle Mk III, carrying the 3136 kg GSAT-19 satellite to a Geosynchronous Transfer Orbit (GTO).
GSLV Mk III-D1/GSAT-19 Mission launched on 5 June 2017, at 11:58 UTC (17:28 IST), from the Second Launch Pad at SDSC SHAR, Sriharikota. GSLV Mk III is a three-stage heavy lift launch vehicle developed by ISRO. The vehicle has two solid strap-ons, a core liquid booster and a cryogenic upper stage. GSLV Mk III is designed to carry 4 ton class of satellites into Geosynchronous Transfer Orbit (GTO) or about 10 tons to Low Earth Orbit (LEO), which is about twice the capability of GSLV Mk II.
> GSLV-Mk III-D1 is the first developmental orbital launch of the Geosynchronous Satellite Launch Vehicle Mk III, carrying the 3136 kg GSAT-19 satellite to a Geosynchronous Transfer Orbit (GTO). GSLV Mk III-D1/GSAT-19 Mission launched on 5 June 2017, at 11:58 UTC (17:28 IST), from the Second Launch Pad at SDSC SHAR, Sriharikota. GSLV Mk III is a three-stage heavy lift launch vehicle developed by ISRO. The vehicle has two solid strap-ons, a core liquid booster and a cryogenic upper stage. GSLV Mk III is designed to carry 4 ton class of satellites into Geosynchronous Transfer Orbit (GTO) or about 10 tons to Low Earth Orbit (LEO), which is about twice the capability of GSLV Mk II.